Chattanooga, TN Mon to Sat
Home/Services/Asphalt Milling
Asphalt · Service

Asphalt Milling

Grind down high spots, ruts, or a tired surface to the right elevation. Milling sets up a clean overlay that bonds tight and drains the way it should.

Cold planingVariable depth millingClean tie insRecycled material available
What It Is

Asphalt Milling done right.

Milling is the prep work that lets a worn pavement get a second life. Instead of tearing out an entire lot or driveway and starting over, milling grinds the existing surface down to a controlled depth. Once the high spots are removed, ruts smoothed, and elevation set, an overlay can be laid on a fresh, bonded surface that will last as long as a brand new install for a fraction of the disruption.

We mill driveways, parking lots, road sections, and commercial yards. Variable depth from a half inch surface skim all the way down to a full removal of the wearing course. The millings come up clean and can be hauled off or reused as base material on rural drives where appropriate.

Milling is also what we use when an existing surface has tied into curbs, drains, or buildings at the wrong elevation. Bring it back to grade, then rebuild the surface on top.

Asphalt Milling project example
What's Included

Every job comes
with the full picture.

Cold Planing
Existing surface ground down to a controlled, consistent elevation.
Variable Depth
From a half inch surface skim to full wearing course removal, depending on the spec.
Edge Profile
Clean tie ins to existing curbs, drains, and adjoining surfaces.
Material Hauloff
Millings hauled off or reused as base for rural drives where appropriate.
Surface Sweep
Lot or drive swept clean and ready for the overlay or sealcoat that follows.
Coordination
Milling sequenced with the paving crew so the new mat goes down on a fresh surface.
Our Process

Four steps,
start to finish.

01
Survey
Check existing elevations against the target finish grade and identify high spots.
02
Mill
Cold planer set to depth, surface ground down to spec across the whole area.
03
Sweep
Loose millings cleaned off so the new lift can bond properly to the surface.
04
Overlay
Hot mix overlay laid on a clean, bonded surface for a finish that holds.
Ready When You Are

Tell us about
your project.

Free walkthrough. Written estimate. No pressure, no obligation.

Free Estimate Call Now